Free Newsletter
Register for our Free Newsletters
Newsletter
Zones
Airport, Border and Port Safety and Security
Left Nav Sep
Bioterrorism
Left Nav Sep
Civil Aircraft
Left Nav Sep
Civil Airlines, Airports and Services
Left Nav Sep
Communications and Navigation
Left Nav Sep
Education, Training and Professional Services
Left Nav Sep
Manufacturing and Materials
Left Nav Sep
Military and Defence Facilities
Left Nav Sep
Military Aviation
Left Nav Sep
Military Vehicles
Left Nav Sep
Naval Systems
Left Nav Sep
Personal Equipment
Left Nav Sep
Software and IT Services
Left Nav Sep
Space and Satellite
Left Nav Sep
Weapons, Ammunition and Explosives
Left Nav Sep
View All
Other Carouselweb publications
Carousel Web
Defense File Logo
New Material Logo
Pro Health Service Zone
Pro Manufacturing Zone
Prosecurity Zone
Web Lec Logo
Pro Engineering Zone
 
 
 
News

Eurotorp - Reliability Demonstration Programme Completed


Strict Standards: Only variables should be passed by reference in /home/defensef/public_html/components/com_zone/handleHTML.php on line 623
Eurotorp
: 24 December, 2006  (Application Story)
MU 90 ALWT : Reliability Demonstration Programme successfully completed
In October 2006, the French and Italian Navies gave official approval to end the MU90 Torpedo Reliability Demonstration Programme.The MU90 is today recognized as the most performing LWT existing ever. The MU90 ALWT project is the result of the strong will of the French and Italian Navies to merge their domestic developments. The MU90 project could not have been successful without the French and Italian political will of unifying their operational requirements, of sharing the development costs and of deploying in the project the top experts of the two countries.

The MU90 features innovative and unique-of-its-kind advanced technologies applied to underwater weapons. Of great operational ambitions, the technical and manufacturing challenges for the torpedo designers to overcome have been significantly thought. The aim was to develop a weapon fully compliant with the modern and complex anti-submarine operational needs and achieve a weapon suitable for global application. The design and industrial difficulties have been mitigated thanks to synergic and complementary efforts deployed by the French and Italian technical staff. The development of the weapon was completed in 1997, followed by extensive TECHEVAL and OPEVAL phases. The torpedo mass production started in 2001 and today more than 1000 MU90 rounds have been manufactured for the French, the Italian and a number of NATO and Allied Navies.

While the torpedo mass production was progressing, an extensive MU90 Torpedo Reliability Demonstration Programme (TRDP) was launched to further maximize the torpedo reliability. The TRPD has been successfully completed in October 2006 after having demonstrated the MU90 reliability has reached incomparable levels. To achieve that, a set of improvements for the weapon have been developed, the BLOCK1 mod. kit. The MU90 (BLOCK1) has been subject to 24 month-long extensive laboratory and sea testing including more than 15 live torpedo exercise firings successfully carried out by the French and Italian Navies from different type of platforms and performed at the extremes of the torpedo operational capabilities. Satisfied with the outstanding results, the French and Italian Navies have finally accepted the MU90 BLOCK1 mod. kit that is to be applied to all MU90 torpedoes. All MU90 customers will enjoy the implementation of the BLOCK1 mod. Kit into their torpedo inventory.
Bookmark and Share
 
Home I Editor's Blog I News by Zone I News by Date I News by Category I Special Reports I Directory I Events I Advertise I Submit Your News I About Us I Guides
 
   © 2012 DefenseFile.com
Netgains Logo